Hi,
I have a Lync 2010 server setup in my organization. The configuration as below.
1 Front End server
1 Backend server
1 Monitoring and Archiving server.
My requirement is to move Back End server to another Physical server (Reason to Move another server is for H/W configuration)
Is there any step to move only Backend Database without disturbing Front End server?
I want to retain same pool and Front end server, Please share Best practices and recommendations.